We removed the tile from all walls, the floor, and the shower down to the studs. We repaired the exterior wall due to a window leak and rewired the bathroom to add an additional outlet and create a new light location. We installed drywall and applied tape, mud, and texture. After painting, we installed the tile floor and completed a custom shower tile installation with new plumbing and a custom glass shower door. Finally, we installed a new toilet, vanity, sink, and mirror.
